|
| MIL-T-63520(AR)
4.2 Classification of inspection. The following types of inspection
shall be conducted on this item:
a. First Article Inspection.
b. Quality Conformance Inspection.
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first article sample as
designated by the Contracting Officer for evaluation in accordance with
provisions of 4.3.2. The first article sample shall consist of the following
items in sample quantities as indicated.
Part Description
Quantity
Drawing
D105D3528
5
Absorber Voltage
Filter, EMI, Gun Control
C116C3553
5
011830465
5
Heat Sink
C11830494
Spacer, Swage Type
5
Terminal Insulated
C11830496
5
B11830498
5
Jackpost, Kit
Holder, Printed Circuit Board
C125C3857
5
B162B7983
Spacer, Swage Type
5
Transformer, Power Stepdown
C167C1097
5
Transformer, Rectifier Assembly
C905D583
5
F11830418
Gun Control Assembly
5
4.3.2 Inspections to be performed. See Table VI specified herein.
4.3.3 Rejection. If any assembly, component or test specimen fails to
comply with any of the applicable requirements, The first article sample shall
be rejected. The Government reserves the right to terminate its inspection
upon any failure of any assembly, component or test specimen in the sample to
comply with any of the stated requirements.
16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |