|
| MIL-T-63520(AR)
6. NOTES
6.1 Intended use. The gun control assembly covered by this specification
is intended for use with gun, automatic, 20MM: M197 on Armament Subsystem.
Helicopter, 20MM M97E1 and M97E2.
6.2 Ordering data. Procurement documents shall specify the following:
6.2.1 Acquisition requirements.
a. Title, number and date of this specification.
b. Quantity required and delivery schedules.
c. Serialization requirements, if applicable.
d. Quality Conformance Inspection, if other than specified in
Section 4 of this specification.
e. First Article sample requirements, if other than specified in
Section 4 of this specification.
f. Packaging requirements. If other than specified in Section 5 of
this specification.
g. Certified test reports and certificates of conformance for each
lot or shipment of product.
6.2.2 Contract data requirements. Contract data requirements for
inspection equipment design shall conform to Data Item Description DI-R-1714,
Tailored.
6.3 Submission of inspection equipment design for approval. See
MIL-W-63150 equipment designs shall be submitted as equired to: Commander,
ARRADCOM, ATTN: DRDAR-QAH, Dover, NJ 07801. Request letter of submittal
should state contractor, contract number, specification number, item
nomenclature, and classification of defects and test paragraphs.
6.4 Submission of results of contractor-conducted examinations and
tests. Unless otherwise specified by the Contracting Officer, the contractor
shall forward requested records of examinations or tests to: Commander,
ARRADCOM, ATTN: DRDAR-QAF-S, Dover, NJ 07801.
Preparing activity:
Custodian:
Army-AR
Army-AR
Project 1005-A611
52
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |