| MIL-T-63533(AR)
4.6.2 Repair parts. At least 2 parts of concurrent repair
parts shall be subjected to the interchangeability test specified
in 4.6.3. Failure of any part to meet the interchangeability
requirements shall be cause for rejection, subject to reconditioning
and further test. A sample consisting of double the number of
parts used in the original test shall be tested using the test
methods specified above.
4.6.3 Test method for interchangeability. UTS's shall be
tested by disassembling and then reassembling the parts specified
below. Parts shall be disassembled from the UTS'S and identical
parts placed together and mixed. Any commercial part (screws,
pins, etc) rendered unserviceable by disassembly shall be replaced
without penalty to the interchangeability test.
LIST OF INTERCHANGEABLE PARTS
TITLE
DRAWING
Pressure Transducer
C116C3555
Gun Control Assembly
F11830418
Slider Assembly
C11830565
Adapter, Recoil Mechanism
D11830567
Feed Assembly, Ammo
F11830886
Turret Control Assembly
F11830908
Logic Control Unit Assembly
F11830922
Turret Assembly
F11830962
Drive Assembly
F189F734
Drive Motor Assembly
D905D490
4.6.4 Repair parts. Concurrent repair parts shall be tested
by disassembling a UTS previously tested 4.6.3 and then reassem-
bling them using the concurrent repair parts. No hand refinement
of parts will be allowed and the assembled UTS shall operate and
function as intended. This test may be performed independently of
the UTS interchangeability testing specified in 4.6.1 and at more
frequent intervals using accepted UTS'S taken from current
production.
4.7 PITOT tube pressure. PITOT tube pressure must be at the
same level or above static pressure when tested. Test equipment
and procedures shall be satisfactory to the contracting officer.
(See 4.4.4).
4.8 Turret assembly brackets. Turret assembly brackets should
be adjusted as specified on the applicable drawing when actuating
the azimuth or elevation switches. Proper clearence between
actuator and switch, and actuator and support shall be inspected.
Test equipment and procedures shall be satisfactory to the
contracting officer. (See 4.4.4).