Click here to make tpub.com your Home Page

Page Title: One and one-half degree elevation error detector
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-63536(AR)
4.6.3.8 One and one-half degree azimuth error detector. Using the
initial conditions defined In the specified requirement of one and one-half
degree azimuth eror detector and with the inputs of output for azimuth error
detector and output of J1-L applied, verify the specified output voltages at
Pin JI-L.
4.6.3.9 One and one-half degree elevation error detector. Using the
inputs defined in the specified requirement of one and one-half degree
elevation error detector, verify the specified output voltages at Pin J1-M.
4.6.3.10 Gunner Q-signal, in-phase. Using the initial conditions of the
specified requirements for coincidence sensor component assembly and with the
inputs fo the gunner Q-signal, in-phase applied, verify the outputs specified
in a, b, and c of the gunner Q-signal, in-phase.
4.6.3.11 Gunner Q-signal, in-phase and low voltage. Using the initial
conditions of the specified requirements for coincidence sensor component
assembly and with the input at Pin J1-A in accordance with the gunner Q-signal,
in-phase and low voltage, verify the outputs specified in a, b, and c of the
gunner Q-signal, in-phase and low voltage.
4.6.3.12 Gunner Q-signal, out-of-phase. Using the initial conditions of
the specified requirements for coincidence sensor component assembly and the
input at Pin J1-A in accordance with the gunner Q-signal, out-of-phase, verify
the outputs specified in a, b, c, and d of the gunner Q-signal, out-of-phase.
4.6.3.13 Pilot Q-signal. Using the initial conditions of the specified
requirements for coincidence sensor component assembly and with the inputs
defined in the specified requirements of pilot Q-signal applied, verify the
characteristics specified in the gunner Q-signal, in-phase; in phase and low
voltage and out-of-phase.
4.6.3.14 TSU Q-signal. Using the initial conditions of the specified
requirements for coincidence sensor component assembly and with the inputs
defined in the specified requirements of the TSU Q-signal applied, verify the
characteristics specified in 4.6.3.13.
4.6.3.15 Tow mode. Using the initial conditions of the specified
requirements for coincidence sensor component assembly and with the inputs
defined in the specified requirements for the tow mode applied, verify the
characteristics specified in 4.6.3.13.
4.6.3.16 Low voltage on +18 V supplies. Using the initial conditions of
the specified requirements coincidence sensor component assembly and with
the inputs defined in the specified requirement of low voltage on 18V
supplies applied, verify the specified output voltage change at Pin J1-L.
4.6.3.17 VXin-phase. Using the conditions and inputs defined in the
specified requirements for coincidence sensor component assembly, fixed
forward mode and Vx in-phase, verify the outputs specified in the gunner
requirement of Q-signal, in-phase.
34

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business