4.3 Preproductions and periodic prodution samples
4.3.1 Preproduction sample. A preproduction sample of one torpedo
tube assembly, manufactured in accordance with 3.2.1 and preserved,
packaged and-packed as specified in the contract Or order, shall be
subjected to the preproduction tests detailed in 4.5, at an activity
designated by the procuring activity (See 6.2). Further production of
the torpedo tube by the contractor prior to approval of the pre-
production sample shall be at the contractor's own risk. Approved
production samples shall be included as a part of the quantity specified
for delivery in the contract or order.
4.3.2 Lot size. Unless otherwise specified in the contract or order,
each shipment of units of product shall be a separate "inspection lot"
and may differ from the quantity specified in the total order or contract.
In any event, all units of a single "inspection lot" shall be made to
the same design, with the same materials and manufacturing techniques,
and shall be part of one continuous production run.
4.3.3 Periodic production sample. From each succeeding lot of 50 or
less, a periodic production sample of one torpedo tube assembly shall be
selected at random and submitted tp an activity designated by the
procuring activity (See 6.2) for periodic production inspection. The
sample shall be examined for compliance with the requirements of the
contract, specification and drawings and tested in accordance with 4.5.
Failure of the sample to comply with any requirement shall result in the
rejection of the lot as determined by the procuring activity (See 6.2).
4.4 Quality conformance inspection. Each torpedo tube Mk 32 Mod 5
and Mk 32 Mod 7 to be delivered under contract shall be subjected to the
tests and examinations of this section.
4.4.1 Test conditions. unless otherwise specified, the torpedo tubes
shall be subjected to quality conformance tests under the following
conditions:
4.4.1.1 Test sequence. The sequence of testing procedures presented
herein is suggested only. The tests may be performed in any order that
will permit the most practical and economical use of manpower and
equipment.