|
| MIL-T-82571A(OS)
3.5.2 Shock
3.5.2.1 Shock, nonoperating_. The torpedo tube assembly, less packing or
packaging, shall be capable of meeting all quality conformance tests after
being subjected to the shock impulses of the magnitude and number specified
in MIL-S-901 for medium weight equipment.
3.5.2.2 Shock, loaded condition. The torpedo tube, loaded with two
dummy torpedoes, shall be capable of meeting all quality conformance tests
after being subjected to the shock impulses of the magnitude and number
specified in MIL-S-901 for medium weight equipment.
3.5.3 Temperature and humidity
3.5.3.1 Low temperature operation, loaded condition. The torpedo tube,
less packaging and packing and in the loaded condition, shall be capable of
withstanding the low temperature conditions specified in 4.5.3.1. While
at the test temperature, the muzzle door heaters shall maintain the muzzle
door operable and free from obstruction due to ice. At the conclusion of
the test and while still at the test temperature, the torpedo tube shall show no
damage and meet all the performance requirements and product characteristics
of this specification.
3.5.3.2 High temperature operation. The torpedo tube, with fully pres-
surized breech assemblies, shall be capable of withstanding the high temper-
ature and humidity conditions specified in 4.5.3.2. At the conclusion of
the test and while still at the high temperature and humidity conditions,
the torpedo tube shall show no corrosion or damage and shall meet all the
performance requirements and product characteristics of this specification.
3.5.4 Marine atmosphere environment. The torpedo tube shall be capable
of withstanding the simulated marine atmosphere or alternative test spec-
ified in 4.5.4 and thereafter shall show no evidence of corrosion or damage
and shall meet all the performance requirements and product characteristics
of this specification.
3.6 Cleanup. Prior to and after final assembly, all components shall be
thoroughly cleaned of loose, spattered, or excessive solder, metal chips,
and other foreign matter. Burrs and sharp edges, as well as rosin flash,
shall be removed.
3.7 Workmanship. The equipment, including all parts and accessories,
shall be constructed and finished in a manner to ensure compliance with all
requirements of this specification. Particular attention shall be paid to
neatness and thoroughness of soldering, wiring, impregnation of coils,
8
I
,
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |