Click here to make tpub.com your Home Page

Page Title: Quality Conformance Tests
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
requirements.
Successful completion of  the test program does not relieve the
contractor of the responsibility to furnish equipment that meets the
An operational test shall be
performance requirements  of this specification.
First Article Tests shall
performed before and after each Environmental Test.
consist of the Quality Conformance Tests of 4.4 and the following
Environmental Tests of MIL-STD-810, Table I Column E.
Method 502, Procedure I.
4.3.2.1 Low Temperature.
The lower storage limit
is -62 C for 72 hours and the lower operational limit is -40 C.
4.3.2.2  High Temperature.
Method 501, Procedure 1.
The higher storage limit
and operational limit are both 71 C.
4.3.2.3
Altitude.
Method 500, Procedure I.
Test specimen will not be operated
Method 510, Procedure I.
4.3.2.4  Dust.
during test.
Time interval between step 2 and step 3 will be 0 to 16 hours at
the contractor's option.
4.3.2.5  Shock.
Method 516, Procedure I.
Apply shock per figure 516.1.1,
Test item will not be operated
peak value 20 g's, duration 11 milliseconds.
during test.
Method 514.1, Procedure XI.
4.3.2.6
Vibration.
Equipment will not be operated
4.3.2.7  Rain.
Method 506, Procedure I.
during test.
4.3.2.8
Humidity.
Method 507, Procedure I.
4.3.2.9    Fungus.
Method 508, Procedure I.
Test item will not be operated
after test.
Method 509, Procedure I.
4.3.2.10 Salt Fog.
4.4  Quality Conformance Tests.
Quality Conformance Tests are those tests
performed during production to verify the integrity of equipment, quality of
workmanship and operational performance for compliance with the requirements
of this specification.  The contractor shall furnish all equipment except that
which is authorized for bailment herein.
All inspection and testing shall be
under the supervision of the Government Representative.
Quality Conformance
Tests shall consist of the following:
Examination of Product
a.
b.
Continuity
Test
c.
Insulation Test
Environmental Sampling Test
d.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business