Click here to make tpub.com your Home Page

Page Title: Consideration of data requirements
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-V-29592(AS)
e.  Selection of applicable level of cleaning, preservation, packaging
and packing required (See 5).
6.3 Consideration of data requirements.  The following data requirements
should be considered when this specification is applied on a contract. The
applicable Data Item Descriptions (DID'S) should be reviewed in conjunction
with the specific acquisition to ensure that only essential data are request-
ed/provided and that the DID's are tai lored to reflect the requirements of the
specific acquisition. To ensure correct contractual application of the data
requirements, a Contract Data Requirements List DD Form 1423) must be pre-
pared to obtain the data, except where DOD FAR Supplement 27.475-1 exempts the
requirement for a DD Form 1423.
Reference Paragraph
DID Number
DID Title
Suggested Tailoring
4.4
DI-NDTI-80809A
Test/Inspection
Reports
4.5.4
DI-R-5299C
Failure Analysis
Blocks 9 & 10 N/A.
and Corrective
Use contractor
Action Report
format
The above DID's were those cleared as of the date of this specification. The
current issue of DOD 501O.12-L, Acquisition Management Systems and Data Re-
quirements Control List (AMSDL), must be researched to ensure that only cur-
rent, cleared DID's are cited on the DD Form 1423.
6.4 First article.  When first article inspection is required, the
contracting officer should provide specific guidance to offerors whether the
item(s) should be a first article sample, a first production item, or a
standard production item from the contractor's current inventory and the
number of items to be tested as specified in 4.4. The contracting officer
should also include specific instructions in acquisition documents regarding
arrangements for examinations, approval of first article test results and
disposition of first articles. Invitations for bids should provide that the
Government reserves the right to waive the requirement for samples for first
article inspection to those bidders offering a product which has been
previously squired or tested by the Government, and that bidders offering such
products, who wish to rely on such production or test, must furnish evidence
with the bid that prior Government approval is presently appropriate for the
pending contract. Bidders should not submit alternate bids unless specifi-
cally requested to do so in the solicitation.
6.5 Subject term (key word) listing.
Capillary tube
Gas discharge
Preparing Activity:
Navy - AS
(Project No. 1650-N169)
16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business