|
| MIL-V-81995/6(AS)
B. PCU
1. Dielectric Strength
2. Insulation Resistance
3. Proof Pressure
4. Leakage
5. Performance
6. Examination
FSR
C.
Bonding Resistance
1.
Burn-In including vibration: before, during, and after the
2.
burn-in, the following functional tests should be performed:
Open Sensor & No Signal Detection
a.
b.
BIT Verification
c.
Dynamic Response
PCU Current Gain & Calibration
d.
e.
Cut-off Frequency & Power Interrupt
f.
Min. Signal Required
Examination
3.
Preparing Activity
Navy - AS
(Project No. 2995-N144)
10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |