  | ![]() MIL-V-81995(AS) 
3.11.3 
Design and construction changes. 
3.11.3.1 
Changes in design.  No changes shall be made in the 
design or materials of a valve that has been qualified in accordance 
with this specification, except when the changes are approved by the 
qualifying activity. 
Changes in part numbers.  Part number changes shall 
3.11.3.2 
be controlled in accordance with 1-302.14 of MIL-STD-1OO. 
Changes in the parts list.  Changes to the approved 
3.11.3.3 
parts list shall be governed by the requirements specified in 3.11.3.2. 
Changes in vendors.  Changes in a vendor or fabrication 
3. 11.3.4 
source of those parts used in the qualified valve shall be in accordance 
with the following procedure:  The manufacturer shall prepare and submit 
to the qualifying activity a list of tests to demonstrate that the valve 
meets all specification requirements for an alternative vendor source. 
The specific tests required to substantiate an alternate vendor as a 
supplier of a valve part shall be defined.  The fabrication source of 
selected vendor components will be included in this list.  The list 
shall be subject to approval by the qualifying activity.  The contractor 
thereafter shall be responsible for insuring that all parts, components, 
and assemblies on the substantiation list comply with the qualified 
controlled.  The contractor shall be responsible for performance of 
substantiation tests to establish satisfactory alternate vendors or 
fabrication sources.  A fabrication source is defined as the prime 
physical source producing the part, component, or assembly. Changes of 
fabrication location, such as to another plant of an individual vendor, 
shall be construed as a change of fabrication source. 
Responsibility for changes.  Approval by the qualifying 
3. 11.3.5 
activity of changes to the qualification test valve does not relieve the 
manufacturer of full responsibility for the results of such changes on 
any valve characteristic. 
QUALITY ASSURANCE PROVISIONS. 
4. 
4.1 
Responsibility for inspection. Unless otherwise 
specified in the contract, the contractor is responsible for the performance 
of all inspection requirements as specified herein.  Except as otherwise 
specified in the contract, the contractor may use his own or any other 
facilities suitable for the performance of the inspection requirements 
specified herein, unless disapproved by the Government.  The Government 
reserves the right to perform any of the inspections set forth in the 
specification where such inspections are deemed necessary to assure 
supplies and services conform to prescribed requirements 
 | 
| 
 