|
| MIL-V-81995(AS)
Table II.
Test plans
Test paragraph
Qualification
Individual
Sampling
test and
inspection
tests
sample number
tests
Number
Title
1
2
3
4.5.1
Calibration
x
x
x
x
4.5.2
Cycling and endurance
x
x
4.5.3
Opening-closing time
x
x
x
x
4.5.4
Leakage
x
x
x
x
4.5.5
Proof pressure
x
x
x
x
4.5.6
Vibration
x
x
4.5.7
Recalibration
x
x
x
x
4.5.8
Teardown and inspection
x
x
x
x
x
Dust
4.5.9
4.5.10
Rain
x
4.5.11
Low temperature
x
x
4,5.12
Fungus
x
4.5.13
Salt fog
x
4.5.14
Humidity
x
4.5.15
High temperature
x
x
4.5.16
x
x
x
Dielectric strength
Pressure drop
x
x
x
4.5.17
x
4.5.18
External load
x
x
ii
4.5.19
x
x
x
Burst pressure
4.5.20.1
Examination
x
4.5.20.2
Dielectric strength
x
4.5.20.3
Proof pressure
x
4.5.20.4
x
Cycling
4.5.20.5
Actuation
x
x
Leakage
4.5.20.6
Each qualification test sample shall be plainly
identified by securely attached tags clearly and durably marked with the
following information, and shall be forwarded to the Commanding Officer,
Naval Air Propulsion Center, Attn: PE-62 Trenton, New Jersey 08628,
after obtaining authorization from the qualifying activity for submittal
of the qualification test samples:
(a) Sample for Qualification Test
Submittal by (name) (date) for qualification test in
accordance with the requirements of
Specification MIL-V-81995(AS) (date) under authorization
(reference letter authorizing tests).
.
(b) Valve: Starter Control, Aircraft Engine
Manufacturer's Part Number
Name of Manufacturer
Specification Sheet Model or other identification
Navy Work Unit Assignment Number
20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |