| MIL-V-82443(OS)
4.6
Periodic production inspection. Periodic production samples
shall be selected in accordance with 4.3.3. The samples shall be tested
in accordance with the following plan:
a.
The Sample of 3 units from the first group of 30 units
will be called the first Sample and will undergo the
tests of Table IX for Sample 1. The sequence of tests
will be as shown in Table IX.
b.
The Sample of 3 units from the second and third groups
of 30 units will be called the second and third Samples
and will undergo the tests of Table IX for Samples 2 and
3 respectively. The sequence of tests will be as shown
in Table IX.
c.
The next Sample will be selected from the next group of
units regardless of whether the shift to Step 2 was
made. This sample will be called the fourth sample
and will undergo the tests of Table IX for Sample 4, etc.
TABLE IX
PERIODIC TEST SEQUENCE
* Visual Check After Testing