| MIL-V-85033A(AS)
1/
Quality conformance inspections - schedule and sequence- .
TABLE II.
Test method
Test requirement
Sample
Tests
paragraph
paragraph
ALL SAMPLES
GROUP 1
4.6.1
1
3.4.1
Cleanliness
2
4.6.2
3.3.6
Inspection
3
3.4.2
4.6.3.1
Proof pressure
4
4.6.3.2
3.4.3
Leakage
4.6.3.3
5
3.4.4
Operating pressure
6
4.6.3.4
3.4.5
Pressure drop
2
AB
C
D
GROUP 2 /
4.6.4.1
1
x
3.4.6,1
1
x
High temperature
4.6.4.2
2
x
2
x
Low temperature
3.4.6.2
4.6.4.3
x
1
Thermal shock
3.4.6.3
x
1
x
4.6.4.4
3.4.6.4
2
x
2
Dust
4.6.4.5
x
Salt fog
3.4.6.5
3
x
3
x
4.6.4.6
3.4.6.6
4
x
4
Humidity
4.6.4.7
3
x
Vibration
3.4.6.7
3
x
3/
4.6.5
x
5
x
5
3.4.7
Service life-
4
x
4
x
3.4.8
4.6.6
Burst pressure
1/
Test sequence is denoted by the number in the sample columns. An X
denotes test not required.
2/ The procuring activity shall decide which tests of Table II, Group 2,
each additional charging valve in excess of four shall receive see
6.2.1).
2/ Charging valves subjected to life tests shall not be subjected to the
burst test.
4.5.1 Individual
tests. Individual tests are those tests conducted by the
contractor on each
charging valve submitted for acceptance under the contract
or purchase order.
Individual tests for charging valves are shown in
Failure to pass these tests shall be cause for rejection.
Table II, Group 1.
11
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |