| MIL-V-85033A(AS)
First article inspections - schedule and sequence-1/
TABLE I.
.
Sample
Test requirement
Test method
Test title
Test
D
A
B
C
paragraph
paragraph
Cleanliness
A
1
3.4.1
4.6.1
1
1
1
B
Inspection
4.6.2
2
3.3.6
2
2
2
C
Proof pressure
3
3.4.2
4.6.3.1
3
3
3
D
Leakage
4
4
4
3.4.3
4.6.3.2
4
E
Operating pressure
3.4.4
4.6.3.3
5
5
5
5
F
Pressure drop
6
6
6
3.4.5
6
4.6.3.4
G
High temperature
3.4.6.1
4.6.4.1
x
7
7
x
H
Low temperature
X
8
3.4.6.2
8
x
4.6.4.2
I
Thermal shock
7
x
4.6.4.3
x
3.4.6.3
7
J
Dust
8
x
x
8
3.4.6.4
4.6.4.4
Salt fog
K
9
x
x
9
3.4.6.5
4.6.4.5
L
Humidity
"3.4.6.6
4.6.4.6
x
10
x
10
M
Vibration
x
9
3.4.6.7
4.6.4.7
9
x
2/
N
Service life
3.4.7
4.6.5
x
11
x
11
Burst pressure
0
3.4.8
4.6.6
10
x
x
10
1/Test sequence is denoted by the numbers in the sample columns. An X de-
2/ notes test not required.
- Charging valves subjected to life tests shall not be subjected to the
burst test.
4.5 Quality conformance inspection. Acceptance of charging valves shall be
on an inspection lot basis. Quality conformance inspection shall consist of
the following tests:
a.
Individual tests (see Table II, Group 1).
b.
Sampling tests (see Table II, Groups 1 and 2).