|
| MIL-W-43001F
(p) Operation of shell doors for compliance with the requirements of
3.5.2.3.2 (side loading machines only) and 3.5.3.1.
(q) Cylinder for compliance with the structural requirements of 3.5.2.6.
(r) Operation of discharge quick-opening valve for compliance with the
requirements of 3.5.2.5.
(s) Cylinder door for compliance with the structural requirements of
3.5.2.7.2 (side loading machines only).
(t) Braking system for compliance with the requirements of 3.5.2.11.
(u) Operation of audible and visual signals for compliance with 3.5.3.2.
(v) Loading and unloading for compliance with requirements of 3.5.4.
Nonconformance to any of the above shall constitute failure of the test.
4.6.2.1 Formulas.
The formulas to be used for test in 4.6.2 shall be as
follows:
Formula A
Sheets
Water level
Temperature
Time
(inches)
(minuted)
(degrees)
Supplies
160
*Soap solution
5
8
1.
Suds
bleach
---
---
---
2.
Intermediate
2
extraction
None
160
12
3
3.
Rinse
None
4.
160
12
Rinse
3
* Soap stock solution shall be prepared based on a ratio of 2 pounds of soap to
1 pound of alkali. The proportion of soap and alkali to quantity of water
shall be 1 pound of supplies per 3 gallons of water.
29
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |