6.
The washer-extractors are intended for use in fixed
6.1 Intended use.
installations.
Acquisition documents should specify the following as
6.2 Ordering data.
applicable.
Title, number and date of this specification.
(a)
Type, style, size, number of compartments and class of supply system
(b)
required (see 1.2 and 3.5.1.5).
When a first article is required (see 3.1, 4.3, and 6.3).
(c)
When a water reuse valve is required (see 3.5.1.4 (b)).
(d)
When the automatic thermal overflow cool down feature is required
(e)
(see 3.5.1.4 (f) (1)).
When noise level limits apply (see 3.5).
(f)
When a lesser number of mounting cylinders is required
(g)
(see 3.5.1.4 (j)).
When the automatic cycle control is required to be of the
(h)
microprocessor type (see 3.5.1.4 (0)).
When pipe and connections are to be furnished for utilizing a
(i)
central circulating soap supply system (see 3.5.1.5).
Power characteristics (voltage, frequency, and number of
(j)
phases) (see 3.5.1.7).
Finish when other than as specified (see 3.5.1.18).
(k)
When electromagnetic compatibility is required (see 3.5.1.19),
(l)
When moisture and fungus-resistant treatment is required
(m)
(see 3.5.1.20).
When anti-vibration protection is not required (see 3.5.1.21).
(n)
When machine is to be tested for 90-percent load absorption
(o)
(see 3.5.1.21).
When divided cylinder machines are to be provided with automatic
(p)
inching or positioning in addition to manual inching provisions
(see 3.5.2.9.1).
When the type II washer-extractors are to be specifically designed
(q)
for sling loading (see 3.5,4).
Selection of applicable levels of preservation and packing
(r)
(see 5.1).
When drawings are required for installation purposes, the successful
(s)
bidder shall furnish drawings showing the exact dimension of the
item, overall floor space requirements, foundation requirements
location and size of hold-down bolts, location and size of all
inlet and outlet lines; the size wire and point where electrical
connection is to be made and electrical characteristics of the
motor(s) of the equipment. When purchases are for the Air Force,
drawings are required within 10 days after award to the successful
bidder.