|
| ![]() MIL-W-48299 (AR)
4.5.11 Tracer Composition Test (Dwg. 9271970).-From the
first three batches of tracer composition produced, the con-
tractor shall submit to the cognizant DCAS representative a
verification record indicating that the tracer composition
complies to Dwg. 9271970. A tracer composition test of the
ingredients shall be performed to determine the percentage by
weight of the individual ingredients. This test shall be for
information only.
4.5.12 Igniter Composition (Dwg. 9258060).- From the
first three batches of tracer composition produced, the con-
tractor shall submit to the cognizant DCAS representative a
verification record indicating that the igniter composition
complies to Dwg. 9258060. An igniter composition test of the
ingredients shall be performed to determine the percentage
by weight of the individual ingredients. This test shall be
for information only.
PREPARATION FOR DELIVERY
5.
5.1 Packaging.- Level C. The warheads shall be packaged
and marked in accordance with Dwg. 9298030.
The warheads shall be packed and
5.2 Packing.- Level C.
marked in accordance with Dwg. 9298028.
5.3 Packing (Alt.).- Level C. The warheads shall be packed
and marked in accordance with Dwg. 9298032.
NOTES
6.
6.1 Intended Use.- See paragraph 1.1 of this specifica-
tion.
6.2 Ordering Data.- See MIL-A-48078
6.3 Submission of Inspection Equipment Designs for
Approval.- See MIL-A-48078. Submit equipment designs as re-
quired, to Commander, ARRADCOM, ATTN:
DRDAR-QAR-Q
Dover, New Jersey 07801.
Preparing Activity:
Custodian:
Army-AR
Army-AR
1340-A-420
Project Number:
63
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |