Click here to make tpub.com your Home Page

Page Title: Testing
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
4 .3.2.5  Box, packing (see dwg. 66 B10122). (Applies if ship-
ping to other than load plant).
4.3.3.1  Outside diameter - Major Defect - Code No. 03008.-Each
finished warhead shall be inserted through a ring gage of 2.792
Inch diameter.  Any warhead that does not pass freely through
the gage shall be rejected and removed from the lot.  The test shall
be performed with equipment in accordance with 4.3.5.
4.3.4
Testing
4.3.4.1  Centrifuge Test (see 3.4) - Non-Arming Critical
Defect 03009.- Arming & Firing Major Defect 03010.-The twenty-four
(24) warheads used In the leak test (see 4.3.4.2) shall be used
for this test.  The 2" warhead samples shall be tested at three
temperatures: 8 warheads at -65 degrees F, 8 warheads at +115 degrees
F and 8 warheads at +150 degrees F.  This test shall be performed
as specified In 4.4.1 using equipment in accordance with 4.3.5.  Any
warhead that arms during the non-arm test or fails to fire within
the specified "g" loads and expel the flechette charge shall be
considered a defective.  One or more defective during the non-arm
test shall reject the lot.  Two or more defective during the
arming and firing test shall reject the lot.  If one defective
occurs during the arming and firing test, the lot represented by the
sample shall be placed in a referred status and a retest shall be
The retest sample shall consist of forth-eight (48)
conducted.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business