Click here to make tpub.com your Home Page

Page Title: Packaging
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-W-50550A (MU)
than 4 hours and then reconditioned to the applicable temperature.
Utilizing a customer-approved centrifuge device, warheads shall be
subjected to an axial acceleration force of 11+2 gravities (g's)
for a period of at least 3 seconds.  Centrifuge power shall then br
turned off and the centrifuge arm shall be slowed to slow down at
a natural rate to a full stop.  If the round does not function, it
shall be considered acceptable and the round again subjected to an
axial acceleration force of 31 2G's for a period Of at least 1.5
Centrifuge shall then be turned off, and the centrifuge
seconds.
arm shall be allowed to slow down at a natural rate.  Warheads shall
fire when acceleration decreased to 15G's or less.  Warhead firing
(flechette expulsion) shall verify the firing requirements estab-
lished in paragraph 3.4 of this specification.
4.4.2  Leak Test (see 4.3.4.2 ).-The warheads selected for
this test shall be subjected to a leak test.  The loaded warhead,
when subjected to a pressure differential of ten PSI at room
temperature shall not leak at a rate exceeding 1 x 10-4 cc/see
for 10 seconds minimum after stabilization.
PREPARATION FOR DELIVERY
5.
Packaging
5.1
5.1.1 Level C .-(For shipment to load plants for further
processing).
(see dwg. 9242056).
5 .1.2  Level A. -The warheads, with Fuzes, shall be packaged
In accordance with dwg. 66C10121.
(If shipped to other than load
plants).
5.2.2  Level A.-The packaged assemblies shall be packed and
(If shopped to other than
marked In accordance with dwg. 66B1O122.
load plants).
6,
NOTES
6.1 Ordering Data.- Procurement documents shall specify the
following:
a.  Title, number and date of this specification.
b.  Data cards.- Data cards shall be prepared for each lot
in accordance with the information specified in Standard MIL-STD-1167.
c.  Provisions for submission of first article sample.
10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business