Click here to make tpub.com your Home Page

Page Title: Preparation For Delivery
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-W-60002A (MU)
4.3.4.2 Supply and maintenance. - Supply and maintenance
of the equipment listed on the IEL shall be in accordance with
Specification MIL-I-45607.
4.3.4.3 Government use of contractor's inspection and test
equipment. - The contractor shall make available to the Govern-
ment all inspection and test equipment necessary for determining
conformance with contract requirements.  Personnel for operating
the equipment and verification of its accuracy shall be supplied
by the contractor for the performance of examination or test by
the Government.
4.4 Test methods and procedures.
4.4.1 Leakage. - The body loading assembly shall be secured
to the required test equipment and a pressure differential
introduced between the rearward explosive charge cavity and all
external surfaces including the forward cavity.  The test equip-
ment shall be such that when a rejection test standard is tested
by an established pressure level differential over a constant
minimum time interval, both of which are maintained throughout
testing, a consistent rejection signal indication results. Any
body assembly which permits a leakage equal to or in excess of
the rejection test standard, shall be classed defective.  The
rejection test standard shall consist of a body assembly which
permits no leakage other than that resulting from a .0082 inch
maximum diameter hole located in the apex of the liner.  Test
equipment sensitivity verification shall be performed at one
"hour maximum intervals of production and immediately prior
to and at the end of acceptance operations for the day.
PREPARATION FOR DELIVERY
5.
5.1 Packaging, packing and marking. - The body assemblies
shall be packaged, packed and marked for interplant shipment
in accordance with Specification MIL-P-10025.
NOTES
6,
6.1 Ordering data. -Procurement documents shall specify the
following:
a.  Title, number and date of this specification.
b.  Ammunition data cards shall be prepared for each lot
in accordance with MIL-STD-1167.
6.2 Inspection code numbers. -The five digit code numbers
assigned to the inspections herein are to facilitate future data
collection and analysis by the Government.
10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business