Click here to make tpub.com your Home Page

Page Title: Corrective Action.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-W-85057(AS)
shall be maintained by the contractor with data feedback to reliability
and related design analysis functions.
3.3.2.5.4 Corrective Action.  The contractor, in conjunction with
failure analysis, shall develop and implement effective corrective action
to limit recurrence of the failure mechanism and its effects.  Corrective
action for those failures reported must be approved by the procuring
activity.  Approval of proposed contractor corrective actions requires
that the contractor has performed the following:
.
a. Analytically or by test established the effectiveness
of the corrective action to the satisfaction of the
procuring activity.
b.
A schedule for the introduction of the above corrective
action.
No individual deliverable articles for which failures are detected in
acceptance tests shall be released for delivery to the procuring activity
until the failure reporting and corrective action process has been initiated.
3.3.3 Cabling and Connections.
3.3.3.1 Cables and Connectors.  The equipment shall provide for the use
of cables and connectors in accordance with Specification MIL-E-5400.
3.3.3.2 Interconnection Cabling.  The equipment shall be capable of
satisfactory operation using external wiring in accordance with the
applicable requirements of Specification MIL-W-5088.
3.3.4 Interchangeabili ty. The equipment shall meet the interchange-
ability requirements of Specifications MIL-E-5400 and MIL-I-8500.
3.3.5 Interference Control.  The "generation of radio interference by
the equipment and the vulnerability of the equipment to radio interference
shall meet the requirements of MIL-STD-461, Notice 3.
3.3.6 Maintainability Provisions.  The maintenance concept for support
of the equipment shall be compatible with the existing ARBS Maintenance Plan,
AVMP-184.  Maintainability features, built-in-test features, construction,
provisions for test points, and other maintainability parameters specified
herein, shall conform to AR-10, with the stated exceptions and clarifications
specified herein.  A maintainability program in accordance with MIL-STD-470
shall be established to enforce and report on the maintainability requirements
of this specification.
3.3.6.1 Fault Diagnosis.  Fault diagnosis at the organizational mainten-
ance level shall be accomplished using Built-In-Tests (BIT) and displays.
Intermediate level fault diagnosis and BIT shall be accomplished using ground
support equipment designated, designed, and planned for Fleet use, and any
combination thereof.
-7-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business