Click here to make tpub.com your Home Page

Page Title: Low batterv voltage test.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-64025
Press the TRANSFER key. Wait for the
Status setuP.
4.5.2.23.1
TRANSFER command to complete (a command has completed when the group
status is displayed - the RCU is then ready to receive and execute a
.
new command). The display should read "1 TRANSFER". Press the GROUP ID
key followed by the TRANSFER key and wait for the.TRANSFER command to
The display should read "2 TRANSFER".  Press the GROUP ID
complete.
key followed by the TRANSFER key again and wait for the TRANSFER
command to complete. The display should read "3 TRANSFER". Press the
GROUP ID key 14 times. Press the DEPLOY key and then the.XMIT switch.
Wait for the DEPLOY command to complete. The display should read "1
DEPLOY". Press the GROUP ID key followed by the DEPLOY key and then
the XMIT switch again. Wait for the DEPLOY command to complete. The
display should read "2 DEPLOY". Press the GROUP ID key 15 times. Press
the DESTRUCT key and then the.XMIT switch. Wait for the DESTRUCT
command to complete. The  display should read "1
DESTRUCT".
Press the GROUP ID key 15
4 . 5 . 2 . 2 3 . 2 RESET
SD  state  test.
times. Press the RESET SD key and then the XMIT switch. Wait for the
RESET SD command to complete. Press the GROUP ID key. For groups 1
thru 15, note the group status and then press the GROUP ID key.
Verify that group 2's status now reads "2 RESET SD" and all other
groups'  statuses have not changed from prior to the RESET SD command
execution.
Press the DEPLOY key and then the
4 . 5 . 2 . 2 3 . 3 DEPLOY
state
test.
XMIT switch. Wait for the DEPLOY command to complete. Press the  GROUP
note the group status and then press
ID key. For groups 1 thru 15,
the GROUP ID key. Verify that group  3's status now reads "3 DEPLOY"
and all other groups' statuses have not changed from prior to the .
DEPLOY command execution. Press
the GROUP ID key 4 times.. Press the
TRANSFER key. The display should read "4 TRANSFER".
4.5.2.23.4 TRANSFER  status  test. Press the GROUP ID key and then
the TRANSFER key. Verify that the group 1's  status still reads "1
DESTRUCT". Press the GROUP ID key and then the TRANSFER key. Verify
that the-group 2's status still reads "2 RESET SD". Press the GROUP ID
key and then the TRANSFER key. Verify that the group 3's status still
reads "3 DEPLOY".
.
4.5.2.23.5 DESTRUCT state test.  Press the GROUP ID key 13
times. Press the DESTRUCT key and then the XMIT switch. Wait for the
DESTRUCT command to complete. Press the GROUP ID key. For groups 1
thru 15, note the group status and then press the GROUP ID key. Verify
that group 2's status now reads "2 DESTRUCT", group 3's status reads
'
"3 DESTRUCT" and all other groups  statuses-have not changed from
prior to
the  DESTRUCT  command  execution.
4.5.2-.24
Low batterv voltage test.
Set the supply voltage at
Pi-RED to 11.05 + 0.05 volts and verify that the battery low indicator
is "off". Lower the supply voltage to 10.25 + 0.05 volts and verify
S e t- t h e
that the battery low indicator flashes as specified in 3.6.4.
supply voltage to 13 + 0.5 volts.
140

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business