Click here to make tpub.com your Home Page

Page Title: Transmitting Power test.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-64025
Connect a 50 + 5% ohm
4,5.2.25 Transmitting current test.
resistive load from the ANTENNA to the RCU case. press the DESTRUCT
key, then press the XMIT switch.' Measure the current into Pi-RED and
verify compliance with the requirements of 3.6.5.
With the supply set to 13 +
Transmitting Power test.
4.5.2.26
0.1 volts, press the DESTRUCT key then press the XMIT key. Measure the
power into the resistive load and verify compliance with the
requirements of 3.6.6.
4.5.2.27 Tuning  (load
matching) capability  test.
With each of
the
complex  loads  of  3.6.7,  perform  the  following:  connect  the  load
the ANTENNA to the RCU case; press the DESTRUCT key, then press
from
the
XMIT switch; measure the power into the SO ohm real component of
.
the
load  and  verify  compliance  with  the  requirements  of  3.6.7.
cutoff  test.  Reduce the supply voltage at
4.5.2.28 Transmitter
Pi-RED to 10.55 + 0.05 volts. Press the DESTRUCT key and then press
.
the XMIT key. Verify transmission responses with the requirements of
3.6.8. Reduce the supply voltage to 9.45 + 0.05 volts. Press the
DESTRUCT key and then press the XMIT key. Verify transmission
response with the requirements of 3.6.8. Set the supply voltatge to 13
+ 0.5 volts.
4.5.2.29 Data retention test.  "Turn the unit power switch off.
Turn the unit power switch on and key in "12345" in the next 15
seconds. Press the COPY key then press the TRANSFER key.  Note the RCD
code, Turn the unit power switch off. Disconnect the positive SUpPly
terminal from Pi-RED. Wait 315 + 15 seconds. Reconnect the positive
supply terminal to Pi-RED. Turn the unit power switch on and key in
the correct STORE code in the next 15 seconds.  Repeat the RCD transfer
test of 4.5.2.12. Verify that the RCD code is the same as noted just
before disconnecting the batteries. Turn the unit power switch off
then on.  Key i n the correct SEND code in the next 15 seconds. Step
thru each group using the GROUP ID key. Verify  that  each  group  status
has retained the status just before disconnecting the battery in
compliance with the requirement of 3.6.9.
4.5.3 High
temperature  test.  Conduct the RCU performance tests
described in the paragraphs 4.5.2 - 4.5.2.29 with the unit under test
temperature stabilized at 145 (+5/-0) degrees F in compliance with
requirement 3.10.
4.5.4 Low temperature test.  Conduct the tests listed in 4.5.3
with the unit under test temperature stabilized at -35 (+0/-5) degrees
F in compliance  with  requirement  3.11.
4.5.5  Tuning Electronic Components Assembly Performance test.
This section describes the performance tests for the Tuning Electronic
Equipment Components Assembly (Tuner), assembly number 9333578.
Unless otherwise specified, all testing  shall  be  sequentially
performed  in  the  order  listed  at  room  ambient  conditions.  Unless
otherwise  specified,  all  test  setup  shall  be  retained  throughout
.
subsequent
tests.
141

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business