Click here to make tpub.com your Home Page

Page Title: Status state up-date test.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-64025
with 3.9.19.1; apply 0.0+_0.2 volts momentarily to A2-E39 (XMIT) then
open; apply a pulse on A2-E58 (VREFL) from 5+_0.2 volts to v volts for
4+_1.0 microseconds beginning on the nth falling edge of A2-E62
(STROBE) during the tune sequence (see the table above for v and n).
Verify the following.
4.5.7.28.1  Tune  sequence.  Verify that the SENDER displays
"TUNING" in compliance with the requirements of 3.9.19.2. Verify that
control-signals at A2-E61 (TUNE), A2-E62 (sTRoBE), A2-E40 (SEND), A2-
E59 (TUNE DATA), and A2-E60 (CLOCK) are in compliance with the
requirements of 3.9.19.3.
4.5.7.28.2  Transmit  display.  After the tuning sequence observed
in 4.5.7.28.1 has completed, verify that the SENDER displays "XMIT
TUNE = m"  where m is the value shown in the table above, as specified
by the requirements of 3.9.19.4.
.
.
4.5.7.28.3 Command .-...
- output sequence.  Verify the biphase data at
" A2-E46 (SEROUT) for the current group with the requirements of
3.9.19.5.
4.5.7,28.4 Group status update.
When transmission has
completed, verify that the SENDER  displays "g  DEPLOY" in compliance
with the requirements of 3.9.17.1 and 3.9.19.6.
4.5.7.29 RESET SD test.  Enter the GRP ID key. The display
should read "ALL". Enter the R'SET SD key and then momentarily apply
0.0+_0.2 volts to A2-E39 (XMIT) then open. V e r i f y t h e b i p h a s e d a t a a t
A2-E46 (SEROUT) for the current group "ALL" with the requirements of
.3.9.19.5. Enter the GRP ID key. For each group 1 thru 15: confirm that
the group status now reads "n  RESET  SD"  in  compliance  with  t h e
requirements of 3.9.19.6, where n is  the current
GROUP ID; then, enter
the GRP ID key.
4.5.7.30 DESTRUCT test.
Enter the GRP ID key, The display
should read "1  RESET  SD". Enter the DESTRUCT key and then
momentarily apply 0.0+_0.2 volts to A2-E39 (XMIT) then open. Verify
the biphase data at A2-E46 (SEROUT) for group 1 with the requirements
of 3.9.19.5. Wait for the DESTRUCT command to complete. Verify that
the display reads "1 DESTRUCT" in compliance  with  the  requirements  Of
3.9.19.6.
4.5.7.31  status state  up-date  test.
Open  the  supplyconnection  to
A2-E34 (+15V). Enter the STORE mode as per 4.5.7.18. Select a new SEND
code as per 4.5.7.17. Apply 0+0.2 volts to A2-E42 (CLEAR) for at least
1  millisecond  then  open. Apply  13+0.5  volts  to  A2-E34  (+15V).  Enter
the newly selected SEND code from above within the next 15 seconds.
Verify  the  following  tests  in  accordance  with  3.9.17.4
4.5.7.31.1
Status
setup.
Enter the TRANSFER key. Wait for the
TRANSFER command to complete (a command has completed when the group
status is displayed - the  RCU  is  then  ready to receive and execute a
new command). T h e display should read "1 TRANSFER". Enter the GRp ID
k e y followed by the TRANSFER key and wait for the.TRANSFER command to
c o m p l e t e . The display should read "2 TRANSFER". Enter the GRP ID key
148

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business