Click here to make tpub.com your Home Page

Page Title: Standby_current test .
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-64025
followed by the TRANSFER key again and wait for the TRANSFER command
to complete. The display should read ".3 TRANSFER". Enter the GRP ID
key 14  times. Enter the DEPLOY key and then momentarily apply
.0.+_0.2 volts to A2-E39 (XMIT) then open. Wait for the DEPLOY command
to  complete. The display should read "1 DEPLOY". Enter the GROUP ID
key followed by the DEPLOY key and then momentarily  apply  0.0+_0.2
volts to A2-E39 (XMIT) then open. Wait for the DEPLOY command to
complete.  The display should read "2 DEPLOY". Enter the GRP ID key 15
times. Press the DESTRUCT key and then momentarily apply 0.0+_0.2
volts to A2-E39 (XMIT) then open. Wait for the DESTRUCT command to
complete. The display should read "1 DESTRUCT".
4.5.7.31.2 RESET SD state test.  Enter the GRP ID key 15 times.
Enter the R'SET SD key and then momentarily apply 0.0+_0.2 volts to
A2-E39 (XMIT) then open. Wait for the RESET SD Command to complete.
Enter the GRP ID key. For each group 1 thru 15: note the group status
and then enter the GRP ID key. Verify that group 2's  status now reads
"2 RESET SD" and all other group statuses have not changed from prior
to the RESET SD command execution.
4.5.7 .31.3 DEPLOY state test.  Enter the DEPLOY key and then
momentarily apply 0.0+_0.2 volts to A2-E39 (XMIT) then open* Wait for
the DEPLOY command to complete. Enter the GRP ID key. For each group 1
thru 15: note the group status and then enter the GROUP ID key.
Verify that group 3's status now reads "3 DEPLOY" and all other group
statuses have not changed from prior to the DEPLOY command executions
Enter the GRP ID key 4 times. Enter the TRANSFER key. The display
should read "4 TRANSFER".
Enter the GRP ID key and then
4.5.7.31.4 TRANSFER status test.
the TRANSFER key. Wait for the TRANSFER command to complete. Verify
that group 1's status still reads "1 DESTRUCT" as per 3.6.18.2.
Enter
the GRP ID key and then the TRANSFER key. Wait for the TRANSFER
command to complete.  Verify that group 2's status still reads "2
RESET SD". Enter the GRP ID key and then the TRANSFER key. Wait" for
the TRANSFER command to complete. Verify that group 3's status still
reads "3 DEPLOY".
DESTRUCT state test.
4.5.7.31.5
Enter the GRP ID key 13 times.
Enter the DESTRUCT key and then momentarily  apply 0.0+_0.2 volts to
A2-E39 (XMIT) then open. Wait for the DESTRUCT command to complete.
Enter the GRP ID key. For each group 1 thru 15: note  the  group status
and then enter the GRP ID key. Verify that group 2's  status now  reads
"2 DESTRUCT", group 3's status reads "3 DESTRUCT", and all other group
statuses have not changed from prior to the DESTRUCT command
execution.
4.5.7.32
Standby_current test .
Wait until the display is blank
after keyboard timeout. Measure the current into A2-E34 (+15V) and
verify compliance with the requirements of 3.9.4.
Set the  supply voltage at
4.5.7.33  Low  batter y voltage test.
A2-E34 (+15V) to 11.05+0.05 volts and verify that the battery low
indicator is "off". Lower the supply voltage to 10.25+0.05 volts and
149

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business