Click here to make tpub.com your Home Page

Page Title: Responsibility for inspection.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-C-70495(AR)
3.6
Workmanship.
The workmanship requirements of MIL-F-13926
and MIL-STD-454 shall be met. All components shall be fitted
All electrica:
properly and firmly in their respective positions.
connections shall be mechanically secure and electrically sound.
There shall be no evidence of corrosion, burrs, roughness, sharp
edges or other defects which could adversely affect its use or
suitability for the purpose intended.
3.7  Materials.  Materials shall be in accordance with
drawings, material specifications and general specifications
forming a part of this specification.
4.
QUALITY
ASSURANCE
PROVISIONS
4.1
Responsibility  for  inspection.  Unless  otherwise
specified in the contract or purchase order, the contractor is
responsible for the performance of all inspection requirements as
Except as otherwise specified in the contract
specified herein.
or purchase order, the contractor may use his own or any other
facilities suitable for the performance of the inspection
requirements specified herein, unless disapproved by the
Government. The Government reserves the right to perform any of
the inspections set forth in this specification where such
inspections are deemed necessary to assure supplies and services
conform to prescribed requirements.
4.1.1  General  provosions.  The  component  and  subassembly
inspection  requirements  of  MIL-F-13926  and  MIL-ST-454  form  a
part of the Quality Assurance provisions of this specification
Definitions of inspection terms shall be as listed in MIL-STD-109
4.2  First  article  (initial  production)  approval.  The
requirement for first article approval and the responsibility
(Government or contractor) for first article testing shall be as
The sample for first article approval
specified in the contract.
test shall consist of three (3) supplies plUS three (3) each Of
all Items covered by QAP.  The three supplies shall be tested as
specified herein for all the requirements of this specification.
The items covered by QAP shall be tested, as specified thereon,
for all characteristics delineated on the QAP.  The samples shall
be manufactured in the same manner, using the Same materials
equipment  8 Processes,  and procedures as will be used in the
production of the balance of the contract quantity. All parts an
materials, including packaging and packing, shall be obtained from
the same source of supply as will be used in the production of tthe
balance of the contract quantity.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business