| MIL-C-70495(AR)
4.2.1 Government testing. When the Government is responsible
or conducting first or article approval tests, the contractor prior
submitting the sample to the Government, shall inspect the
ample to insure that it conforms to all requirements of the
contract and submit a record of this inspection with the sample,
including certificates of conformance for all materials.
4.2.2 Contractor testing. men the contractor is responsible
or conducting first article approval tests, the sample shall be
inspected by the contractor for all the requirements of the
contract. The sample and a record of this inspection, including
certificates of conformance for all materials, shall be submitted
or the Government for approval. The Government reserves the right
so witness any. or all of the contractor's inspections.
4.3 Inspectictions. Provisions
4.3.1 Submission of product. Unless otherwise specified by
the contracting officer, inspection lot size, lot formation, and
presentation of lots shall be in accordance with Submission of
product" provision of MIL-STD-105.
4.3.2
Examination
and
tests.
4.3.2.1 Components and subassemblies. All components and
subassemblies shall be inspected in accordance with the inspection
provisions contained in Quality Assurance Provisions (QAP's)
In the absence of
listed in the Technical Data Package (TDP).
QAP's, the applicable Quality Assurance Provisions of MIL-F-13926
shall apply.
4.4
Sampling.
The supply shall be
4.4.1 Environmental/ performance.
inspected to the requirements in Table II.
Classification of defects.
TABLE II.
Test Procedure
Requirement
Characteristics
No.
100%
Inspection
4.6.3.1
3.2.1.1
Display on
1.
4.6.3.2
3.2.1.2
Positive volts
2.
4.6.3.3
3.2.1.3
Battery volts
3.
4.6.3.4
3.2.1.4
Output ripple
4.
Overload/shortcircuit
5.
4.6.3.5
3.2.1.5
protection
4..6.3.6
3.2.1.6
Power supply run
6.
Electroluminescent
7.
4.6.3.7
3.2.1.7
panel high
6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |