Click here to make tpub.com your Home Page

Page Title: Endurance test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-D-44144A(GL)
4.5.3 OSHA.  Acceptable evidence of meeting the requirements of OSHA shall be
a certificate of compliance certifying that the drying tumblers being furnished
under this document conform to the applicable requirements for laundry equipment
29 CFR 1910.264 of OSHA Standard.  The Government reserves the right to check
test such tumblers to determine the validity of the certification,
4.6 Methods of inspection.  Commercial power source and No. 2 diesel fuel
shall be used for the applicable tests.
4.6.1 Endurance test.  The drying tumbler motors shall be check-tested for
proper motor rotation.  Motors with improper rotation shall be corrected,  Each
dryer shall then be loaded and operated (see table 111) at a rate of four drying
cycles per hour.  Any nonconformance with the requirements of 3.6.1 shall
constitute failure of this test.
TABLE III.
Endurance test data
Water
Drying
Total
Dry weight temperature
Number of
retention weight
Material"  (pounds) (OF + 10F)
drying cycles
(percent)
(pounds)
Trousers
135
30
80 (13 minutes each)
25
37.5
4,6.2 Drying test.  Each drying tumbler shall be loaded and operated (see
table IV) at a rate of five drying cycles for each material.  Any nonconformance
with the requirements of 3.6.2 on 80 percent of the cycles shall constitute
failure of this test,
Drying test data
TABLE IV.
Water
Drying
Total,
Dry
retention
weight
Drying time
weight
temperature
(0F + 10F)
(minutes)
(percent)
(pounds)
Material
(pounds)
--
Trouser 30
37.5
13
25
135
25
37.5
Sheets 30
250
10
200
25
13
Blankets 30
37.5
4.6.3 Door switch test (activation prevention),  With the door open push the
start switch.  The burner shall not turn on and the tumbler shall not be
rotating.  Any nonconformance with the requirements of 3.6.3 shall constitute
failure of this test.
12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business