| MIL-D-70789A (AR)
TABLE VI.
Qualification
inspection.
No. of
No. of
Failures
Method
Requirement
Sample
Allowed
Paragraph
Paragraph
Inspection
Units
4.8.1
0
All
3.5, 3.8 & 3.10.1
Physical Examination
4.8.6.1
0
All
3.6
Operational
Demonstration
0
1
3.5,3.6,3.8 & 3.10
4.8.7
Design Verification
4.8.4
0
1
3.8.7
Human Factor
All**
3.7.1.1 & 3.7.1.3
4.8.5.5
0
Low Temperature
All**
3.7.1.1 & 3.7.1.3
4.8.5.4
0
High Temperature
4.8.5.6
0
1
3.7.1.2
Temperature Shock
4.8.5.7
0
1
3.7.6
Solar Radiation
4.8.5.3
0
1
3.7.2
Altitude
0
4.8.5.11
3.7.7
1
Washdown
0
4.8.5.14
1
3.7.10.2
Shock
& 3.7.10.3
4.8.5.15
0
3.7.11
1
Vibration
4.8.5.8
0
1
3.7.3
Humidity
4.8.5.13
0
3.7.9
1
Fungus
4.8.5.12
0
3.7.8
1
Salt Fog
4.8.5.16
0
3.7.13
1
EMI-EMC
& 4.8.5.17
& 3.7.14
0
4.8.5.18
3.7.15
1
Electrostatic
Discharge
4.8.5.19
0
3.7.16
1
Lightning
4.8.6.2
2
3.6.3
Reliability
Demonstration
4.8.6.3
3.6.4
Note 2
Maintainability
Demonstration
4.8.5.9
0
3.7.4
1
Snow
4.8.5.10
0
1
3.7.5
Icing
4.8.6.4
- 0
3.5, 3.6, 3.8
3
Performance
& 3.10
Demonstration
4.8.5.20
0
1
3.8.3
NBC Survivability
4.8.5.21
0
Nuclear Survivability 1
3.8.2
4.8.5.22
0
3.8.6.2
Explosive Atmosphere 1
4.8.8
0
1
3.8.3.2
Nuclear Hardness
**The temperature storage test shall be performed on 3 units.
Failure to submit the report within 30 days after the end of each
6-month period may result in loss of qualification for the
product. In addition to the periodic submission of inspection
data, the contractor shall immediately notify the qualifying
activity at any time during the 6-month period that the
inspection data indicates failure of the qualified product to
meet the requirements of this specification.