MIL-G-85536(AS)
4.
QUALITY ASSURANCE PROVISIONS
4.1 General. This section establishes the methods used to verify that
the gun system as a fabricated and assembled unit, complies with the
requirements of this specification.
4.1.1 Responsibility for inspections. Unless otherwise specified in the
contract or purchase order, the contractor is responsible for the performance
of all inspection requirements as specified herein. Except as otherwise
specified in the contract or purchase order, the contractor may use his own or
any other facilities suitable for the performance of the inspection require-
ments specified herein, unless disapproved by the procuring activity. The
procuring activity reserves the right to perform any of the inspections set
forth in the specification where such inspections are deemed necessary to
assure supplies and services conform to prescribed requirements.
4.1.2 Failure criteria. If a failure (see 6.3.4) occurs during the
tests of 4.2.2, 4.2.3, and 4.3 specified herein, the following action
shall be taken by the contractor:
a.
A failure report shall be prepared (see 6.2.2)
A failure investigation shall be performed
b.
The cause of failure shall be determined
c.
d.
Corrective action shall be recommended.
4.1.3 Test conditions and equipment. All firing tests shall be
performed with the gun system affixed to the test stand conforming to Drawing
799E100. The contractor shall furnish the applicable measuring devices and
instrumentation to measure and record test data. Calibration of the test
equipment shall be in accordance with MIL-STD-45662. The contractor shall
provide all necessary supplies and services except GFP to accomplish the
testing specified herein. Unless otherwise specified in the contract or
purchase order, all gun system test firing shall be with PGU-23/U ammunition
(see 3.1.2). Unless otherwise specified herin, all tests shall be performed
under environmental conditions existing at the test site.
4.1.4 Test plan. When specified in the contract or purchase order, a
contractor proposed test plan and test procedures shall specify methods to be
used for acceptance of the gun system (see 6.2.lb). Test plan and procedures
shall be subjected to review and acceptance by the procuring activity (see
6.2.2).