|
| MIL-I-23453(WEP)
Performance Test. - After completion of the last cycle each
4.4.4.2.3
igniter shall be fired at 175F in accordance with 4.6.2. The performance of
each unit shall comply with the requirements of 3.4.
Acceptance Tests.
4.5
4.5.1
Nondestructive Testing.
- Each igniter delivered or tested shall be ex-
4.5.1.1
Examination.
amined to assure quality of workmanship, use of proper materials and assembly,
and absence of visual defects or other imperfections that would affect the life or
function of the unit.
4.5.1.2
Electrical Resistance. - The electrical resistance of each ig-
niter delivered or tested shall be determined and shall comply with the require-
ments of 3.3.
7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |