|
| ![]() 3.5.3 Temperature and humidity.
The igniter shall withstand the temperature and
humidity test (see 4.6.5).
3.54 Vibration. The igniter shall withstand the simulated shipboard vibration test
(see 4.6.6)
3.5.5 Acceleration. The igniter shall withstand the 15 g load and acceleration test
(see 4.6.7)
3.5.6 High temperature test. The igniter shall not ignite when subjected to a tempera-
ture of 350 F for 120 minutes minimum (See 4.6.8).
3.57 Salt Spray The igniter shall withstand the salt spray test without corrosion or
damage (see 4.6 9)
3.5 8 T ransportation shock. storage, and handling. The igniters. when packed in
accordance with Section 5. shall not rupture so as to spill the package contents or break
the seals on unit packages (see 4.6. 11).
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility y for inspection. Unless otherwise specified in the contract or
purchase order, the contractor is responsible for the performance of all inspection require-
ments as specified herein. Except as otherwise specified in the contract or purchase order,
the contractor may use his own or any other facilities suitable for the performance of the
inspection requirements specified herein unless disapproved by the Government. The
Government reserves the right to perform any of the inspections set forth in the specifi-
cation where such inspections are deemed necessary to assure that supplies and services
conform to prescribed requirements.
4.2 Classification of inspections. The inspection requirements specified herein are
classified as follows
a. First article inspection (see 4.4).
b. Quality conformance inspection (see 4.5).
4.3 Inspection conditions. Unless otherwise specified in the contract (see 6.2.1), all
inspections shall be performed in accordance with the test conditions specified herein.
4.4 First article inspection. First article inspection shall be performed by the con-
tractor, after award of contract and prior to production, at a location acceptable to the
Government. First article inspection shall be performed on sample units which have been
produced with equipment and procedures normally used in production. Frost article
approval is valid only on the contract under which it is granted, unless extended by the
Government to other contracts.
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |