|
| MIL-L-85590(AS)
While the loaded launcher is being subjected to the fast
3.5 Fast cook-off.
cook-off test as specified in MIL-STD-1648, there shall be no reaction greater
than burning from motors, warheads, or fuzes for a period of not less than five
minutes.
When specified in the contract or
3.6 Government-furnished equipment.
purchase order (see 6.2.1 ), the Government will furnish the contractor with
dummy and inert stores to be used for testing the launcher (see 6.3).
3.7 Workmanship. Workmanship practices shall be in accordance with MIL-
STD-454, Requirement 9.
Soldering practices shall be in accordance
3.7.1 Soldering practices.
with MIL-S-45743.
4.
QUALITY ASSURANCE PROVISIONS
Unless otherwise specified in the con-
4.1 Responsibility for inspection.
tract or Purchase order, the contractor is responsible for the performance of
Except as otherwise speci-
all inspection requirements as specified herein.
fied in the contract or purchase order, the contractor may use his own or any
other facilities suitable for the performance of the inspection requirements
The Government re-
specified herein, unless disapproved by the Government.
serves the right to perform any of the inspections set forth in the specifi-
cation where such inspections are deemed necessary to assure supplies and
services conform to prescribed requirements.
The inspection requirements speci-
4.2 Classification of inspections.
fied herein are classified as follows:
First article inspection (see 4.4).
a.
Quality conformance inspection (see 4.5).
b.
4.3 Inspection conditions. Unless otherwise specified herein, all inspec-
tions shall be performed in accordance with the following test conditions:
+21.0 +5.5C (+70 +1OF).
Temperature:
a.
Relative humidity: Not greater Than 80 percent.
b.
7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |