Click here to make tpub.com your Home Page

Page Title: Pre-production sample
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-M-21124(NOrd)
D. Bolt circle diameter and bolt spacing in flange for extender.
E. Bolt circle diameter and bolt spacing in flange for clock
starter.
F. Inside diameter of coil tube.
G. Inside length and straightness of coil tube.
EL Location and spacing of holes in suspension lug pads for the 30
inch center-to-center spaced lugs.
L  Location and spacing of holes in suspension lug pads for the
14 inch center-to-center spaced lugs.
J.  Profile and location of holes in suspension lugs prior to
asse mbly on the case.
K  Inside diameter and depth of battery compartment.
L. Inside diameter of coil tube coupling.
M. Bolt circle diameter and bolt spacing in flange for coil "tube.
No Bolt circle diameter and bolt spacing in flange for filling hole.
o. Bolt circle diameter and bolt spacing in flange for tail cover.
P. Inside diameter of flange for tail cover.
Q. Inside diameter of extender well.
R.  Location of center of extender well with relation to center of
extender well flange.
4,1.2 Sampling. - Unless otherwise specified, and when applicable,
the sampling plans and procedures used by Government inspector in the
determination of the acceptability of products submitted by a supplier for
Government inspection shall be in accordance with the provisions set
forth in MIL-STD-105.
4. 1.3 Pre-production sample. - Unless otherwise specified for each
contract or order, a representative sample of (10) Mine Cases Mark 25
Mod 1 shall be manufactured using the methods and procedures proposed
for the production lot. These cases shall be submitted to the Government
inspector for pre -production tests at an activity designated in the contract
or by the Bureau of Ordnance, for purposes of determining compliance
with the requirements of the contract, specifications and drawings.
Further production of the item by the contractor prior to approval of the
contracting activity or the completion of tests on pre -production samples
shall be at the contractor's risk, Pre-production samples accepted will be
applied as part of the quantity specified by the contract or order.
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business