| MIL-M-21124(NOrd)
4.4 Test equipment. - The following items of test equipment are
required to perform the acceptance tests set forth in this specification:
(a) A suitably large" tank for submerging the Mine Case
Mark 25 Mod 1
(b) A source of air under pressure with regulating means
4.5 Acceptance tests.
4. 5,1 The Contractor or Government inspector shall conduct accept-
ance tests as specified in 4. 3.1 to assure that the Mine Case Mark 25
Mod 1 is in compliance with the requirements of 3.2, and 3.4, 1 through
3.4.16.
4. 5.2 Test conditions. - Unless otherwise specified the Mine Case
Mark 25 Mod 1 shall be subjected to acceptance tests under the following
conditions:
Room ambient 65 degrees F to 95
4. 5.2.1 Temperature:
degrees F (18. 33 degrees C to 35.0
degrees C),
Normal ground.
4, 5,2, 2 Altitude:
None
4. 5.2.3 Vibration:
Room ambient.
4. 5.2.4 Humidity:
4. 5.3 Test and inspection equipment and facilities. - The manufacturer
shall furnish and maintain all necessary test equipment, facilities and
personnel for performing all acceptance tests, The test equipment shall
be adequate in quantity, and when definite requirements are not specified
they shall be of sufficient accuracy and quality to permit performance of
the required acceptance tests.
4.5.4 Test procedure,
4.5.4.1 Tests. - The following tests shall be performed on finished
mine cases after the surfaces have been prepared for painting and prior to
the application of any coatings to the surfaces of the mine cases and
following all grinding operations.
|