a. Not more than two fuzes fail to function or not more
than three mines are damaged beyond reuse in the test described in
4.5.5.1.
b. Not more than two mines are damaged beyond reuse in the
test described in 4.5.5.2.
Not more than two mines are damaged beyond reuse in the
test described in 4.5.5.3.
The lot shall be rejected if, in the aggregate of test and
retest:
a.
Four (4) or more mines were damaged beyond reuse as
tested in 4.5.5.1 and more than two fuzes fail to function.
Four (4) or more mines were damaged byond reuse as
b.
tested in 4.5.5.2.
c.
Four (4) or more mines were damaged beyond reuse as
tested in 4.5.5.3.
5.
PACKAGING.
Packing.
5.1
5.1.1 Level A. The mines, with Arming plug wrench, M20, sha11
be packed in accordance with Dwg. 7548171.
5.2 Marking.
Marking of the boxes shall be in accordance with
Dwg l 7 5 4 8 1 7 1 .
when mines from more than one lot are shipped at
5.3 Shipping.
one time, each lot shall be kept separate, and the division between
lots clearly indicated to prevent mixing of the lots in transit.
NOTES
6.
Ordering data.
See MIL-A-48078.
6.1
6.2 Submission of inspection equipment designs for app roval.
(See MIL-A-48078). Equipment designs sha11 be submitted as required
to: Commander, U.S. Army Armament Research and Development Command,
DRDAR-QAT-I, Dover, New Jersey 07801.
Request letter of
ATTN:
submittal should state contractor, contract number, specification
number, item nomenclature, and classification of defects and test
paragraph number.
|