Click here to make tpub.com your Home Page

Page Title: Acceptance and rejection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-48571(MU}
4.3.3 Acceptance and rejection.- Rejected lots shall be screened for
all defective characteristics.  Removal or correction of defective units
and resubmittance of rejected lots shall be in accordance with "Acceptance
and Rejection" as specified in MIL-STD-105.
4.4 Special sampling.
4.4.1 General.- One periscope shall be selected at randdom as a special
sampling from each 100 produced.  The sample shall meet the requirements and
tests in Table II.
TABLE II
TEST PROCEDURE
REQUIREMENT
NO.
CHARACTERISTIC
Applicable drawings and
3.1
Fabrication
301.
specifications - visual
MIL-F-13926 - visual
3.3
General specification
302.
4.4.2 Interchangeability.- Three periscopes that have met the require-
ments and tests in 4.3.2.3 and in Table I shall be selected at random as a
special sample from each months production.  Each sample shall then meet
the requirement and test in Table III.
TABLE III
TEST PROCEDURE
REQUIREMENT
CHARACTERISTIC
NO.
4.6.7.1
3.2a
Interchangeability, modules
303.
4.4.3 Environmental.- Three periscopes shall be selected at random as
samples from each 50 produced, or from each months production, whichever
occurs first.  Each sample shall meet the requirements and tests in Table IV
and shall then meet the requirements and tests in 4.3.2.3 and in Table I.
TABLE IV
TEST PROCEDURE
REQUIREMENT
CHARACTERISTIC
NO.
304.
Storage temperature
4.6.1.1
3.4.1
(-80 and +160F)
Operating temperatures
305.
4.6.1.2
3.4.2
(-40 and +150F)
Operability, elevation input
306.
4.6.1.2, 4.6.2.1
3.4.2, 3.5.1
coupling
307 l
Operability, diopter movement -
4.6.1.2, 4.6.2.2
3.4.2, 3.5.2
Daylight and Passive
308.
Operability, focusing mechanism
4.6.1.2, 4.6.2.3
3.4.2, 3.5.3
Passive
309.
Operability, disengagement of
boresight knob locks - Daylight
4.6.1.2, 4.6.2.4
3.4.2, 3.5.4
and Passive
13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business