| m*-? -82436(OS)
TABLE II
VIBRATION SCHEDULE
3.4.2
Acceleration, ready condition. The pump, mounted as shown in
Figure 1, shall be capable of meeting the performance requirements after
being subjected, in the ready condition, to the accelerations defined in
Table III for a duration of 1 minute for each magnitude. Acceleration, is
defined in 6.3.5.
TABLE XII
ACCELLARATION SCHEDULE
Shock, ready condition. The pump, mounted as shown in Figure 1,
3.4.3
shall be capable of meeting the performance requirements after being subjected,
in the ready condition, to the shock loads defined in Table IV. Shock is
defined in 6.3.6.