MIL-P-82436(OS)
TABLE V
PREPRUDUCTION TEST SEQUENCE
4.4.2
Test conditions. Unless otherwise specified, the pumps shall
be subjected to the tests in 4.4.1 under the following conditions:
Temperature:
Room ambient
F
F
Altitude:
Normal ground atmospheric
pressure
Vibration:
None
Humidity:
Room ambient
4.4.3
Test equipment and set-up.  The following items of equipment
are required for the preproduction tests.
4.4.3.1
Test stand.  The instrumentation required to obtain and record
the pump performance data shall have a total range commensurate with the
testing range and accuracies as indicated,  An oscillographic recorder
and associated transducer shall be used in addition to the visual readout
equipment for the functions so indicated.  The readout error of the
percent, maximum.  The pre-
oscillographic recording system shall be
production test equipment snail be assembled in accordance with Figure 2.
When performing operational tests using Otto fuel, all components con-
taining Otto fuel shall be enclosed by a barrier, thus providing protection
for personnel.
9