| Test data sheets. All test data shall be recorded on a data
4.4.5
sheet by the supplier and maintained as part of the inspection records.
In addition to the data required by 4.5.5 the data sheets shall contain,
but are not limited to, the following information:
4.4.6
Determination of defect or failure. Failure of a pump to
successfully pass any of the tests in 4.4 through 4.4.4.10 shall be
cause for rejection of the preproduction sample.
4.5
Acceptance inspection. Each pump produced under the contract
or purchase order shall be subjected to the following tests and examinations.
4.5.1
Tests and examinations.
a.
Operational test
b.
Visual examination
4.5.2
Test conditions. Unless otherwise specified, the pump shall
be subjected to the acceptance tests under the following conditions:
Room ambient +32 F to +98 F
a.
Temperature:
Normal ground atmospheric pressure
Altitude:
b.
None
c.
Vibration:
d.
Room ambient
Humidity:
Test equipment and set-up. The test equipment set-up shall be
4.5.3
in accordance with Figure 3.
Adjust-
Bias pressure control, regulated inert gas supply:
a.
able output range, 0 to 1250 psig
b.
Low pressure inert gas supply: Adjustable range, 0 to 25
psig nominal