Click here to make tpub.com your Home Page

Page Title: Qualification by analysis, inspection, and demonstration.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-R-85325(AS)
1.
The 113 kilogram (250 pound) store shall util-
ize applicable suspension lugs,  spaced 355.6
millimeters (14 inches) apart.  Its center of
gravity shall be based on the MK 81 L.D.G.P.
bomb.
The 453 kilogram (1,000 pound) store shall
2.
utilize  applicable  suspension  lugs,  spaced
355.6 millimeters  (14 inches) apart.
Its
center of gravity shall be based on the MK 83
L.D.G.P. bomb.
The 907 kilogram (2,000 pound) store shall
3.
utilize applicable suspension lugs, spaced 762
millimeters (30 inches) apart.  Its center of
gravity shall be based on the MK 84 L.D.G.P.
bomb.
The 1,621 kilogram (3,575 pound) store shall
4.
utilize applicable suspension lugs, spaced 762
millimeters (30 inches) apart.  Its center of
gravity shall be midway between the suspension
lugs and 203 millimeters (8 inches) below the
hook bearing surface of each suspension lug.
f.
Input power requirements.
The bomb rack shall
perform satisfactorily under all applicable condi-
tions specified herein from a 28 VDC rated voltage
power  source  with characteristics  and limits as
defined in MIL-STD-704, except that the bomb rack
shall operate over a range of 20 to 30 VDC, measured
at the bomb rack's input connector(s).
4.6
Inspection.
4.6.1
Bomb rack inspection.  Each bomb rack shall be inspected
to ensure that it has been properly assembled and adjusted, that the
electrical connections are secure and that the workmanship is as speci-
fied herein (see 3.7).
4.6.1.1 Qualification by analysis, inspection, and demonstration.
All requirements for the bomb rack not qualified by testing shall be
qualified by analysis,  inspection or demonstrations approved by the
procuring activity.
4.6.1.2
Packaging inspection.  Each bomb rack shall be examined
to ensure that the preparation for delivery conforms to this specifica-
tion (see section 5).
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business