Click here to make tpub.com your Home Page

Page Title: Weld peel test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-S-13261G(AR)
4.5.11 Weld peel test.  The weld on the tail assembly shall be
tested in accordance with the procedures specified in MIL-W-12332.
After test the assembly shall be examined to determine compliance
with the drawing requirements.  If any weld fails to comply with the
requirements, the lot shall be rejected.
4.5.12 Propellant ballistic test.  The signals shall use
propellant spacer, part no. 8797936, in the forward and aft end
while following the test procedure of 4.5.2.  Simulated or dummy
payloads may be used.
PREPARATION FOR DELIVERY
5.
5.1 Preservation and packaging.
5.1.1 Level A.  The signals shall be preserved and packaged in
accordance with Drawing 7548414.
5.2 Packing.
5.2.1 Level A.  The containers shall be packed and packaged in
accordance with Drawing 7548415.
5.3 Marking.  The containers shall be marked as specified on
Drawings 7548414 and 7548415.
NOTES
6.
Procurement documents shall specifiy the
6.1 Ordering data.
following:
Title, number and date of this specification.
a.
Data cards. - Data cards shall be prepared for each
b.
lot in accordance with the information specified in
MIL-STD-1167 .
Provisions for submission of first article samples.
c.
6.2 Submission of designs for approval.  Contractor designs
shall be approved by the Government prior to fabrication or
procuring the equipment.  Designs shall be submitted for approval to
ARRADCOM, DRDAR-QAR-I, Dover, New Jersey  07801 in accordance with
the stipulations, time frame and distribution specified in the
Contract Data Requirements List (DD Form 1423) or in the contract,
Partial submission of inspection equipment designs is permissible
and encouraged.  However, the completion date for design review will
be based on the date of the final submission of designs.  ARRADCOM
design review will normally be accomplished within one month after
receipt.
39

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business