Click here to make tpub.com your Home Page

Page Title: Schedule I - Dry Firing Tests
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-T-82571A(OS)
4.4.5.22.3 Control valve operating lever.  During all dry firing tests
observe that there is no leakage or premature air escape while the control
valve is in the safe condition.
4.4.5.22.4 Ready light circuit operation.  During the dry firing tests,
verify that the ready light circuit condition is in accordance with Schedule
I when the control valve operating lever is in the READY condition. Measure-
ments should be made across terminals 7 and 8 of TB104 for Barrel No. 1 and
across terminals 3 and 4 of TB105 for Barrel No. 2.
4.4.5.22.5 Breakaway plug mechanism.  After each dry firing, the break-
away plug mechanism shall be in the latched position and shall be capable
of being unlatched by hand.
4.4.5.22.6 Electrical firing test.  Each barrel electrically fired shall
fire with only one 400 millisecond application of test potential. TWO firings
shall be made at 102.5 plus or minus 0.5 volts ac and two firings at 123.5
plus or minus 0.5 volts ac.
*
SCHEDULE I - DRY FIRING TESTS
NOTE:  Each barrel is to be fired five times
as outlined below.
**Indicates firing is to be attmpted electrically prior to manual firing.
This is to check pressure switch control of firing circuit. The barrel
cannot be fired electrically unless the ready light is on.
Ensure that the applicable barrel is secured at proper attitude to be com-
patible with track.
18

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business